Summary: the irrigation discount can reduce the cost of eligible electricity consumption within a daily schedule of 8 hours and 30 minutes. The percentage depends on the location and tariff group. MME Ordinance No. 137/2026 allows a continuous schedule or one split into up to three periods, as agreed with the distribution utility. Before changing operations, check the consumer unit's classification, documentation and formalized operating times. A tariff discount does not mean the same percentage reduction in the entire bill.
What is the electricity tariff discount for irrigation?
Article 25 of Law No. 10.438/2002 provides special discounts for consumer units in the Rural Class, including rural electrification cooperatives, on consumption used for irrigation and aquaculture. The wording introduced by Law No. 15.235/2025 establishes a daily period of 8 hours and 30 minutes, under a schedule agreed with the distribution utility and subject to federal guidelines.
This does not make all consumption on the property eligible for the discount. The activity served, eligible loads, metering and contractual classification need to be checked. Operating times are part of the information required for system design and the benefit application.
What is the discount in each region?
Article 186 of ANEEL Normative Resolution (REN) No. 1.000/2021 sets out the following percentages on eligible electricity consumption tariffs:
| Location of the consumer unit | Group B | Group A |
|---|---|---|
| The Northeast and municipalities in Minas Gerais within the geoeconomic regions Polígono da Seca, as defined by Law No. 1.348/1951, and Vale do Jequitinhonha | 73% | 90% |
| The North, Central-West and other municipalities in Minas Gerais | 67% | 80% |
| Other regions | 60% | 70% |
Check the tariff group on the bill and in the consumer unit's registration. For Group B, paragraph 1 addresses application after the tariffs for subgroup B2; for Group A, it prohibits the cumulative application specified in that provision. The table alone does not establish that a consumer unit meets every requirement.
Do not calculate savings by multiplying the entire bill by the percentage in the table. Ask the distribution utility to identify the calculation basis for consumption components, including TE and TUSD as applicable to the classification, and how the discount applies to tariff-flag charges. Article 25, paragraph 3, of Law No. 10.438/2002 also provides for the discount to apply to tariff flags. In the simulation, separate consumption in kWh, demand in kW and the other charges on the bill.
What changed in 2026 under MME Ordinance 137?
MME Normative Ordinance No. 137, dated 8 June 2026, detailed the flexible scheduling arrangements. CPFL and Cemig already describe this option through their official channels:
- The daily 8h30 can be continuous or divided into up to three periods, in multiples of 30 minutes.
- The consumer has preference in choosing the times, taking into account periods of lower system demand.
- The interval from 17h to 21h30, local time, is excluded as a general rule.
- Different schedules may be requested for different parts of the year. Within each schedule, the times are fixed for every day of the week.
- The times must be formalized with the distribution utility in a contract, agreement or equivalent instrument.
Exceptional system restrictions require technical studies approved by ANEEL. The ordinance also provides for the distribution utility to request the Agency's authorization to grant the discount during the normally excluded interval in those circumstances. This does not allow the consumer to change the schedule independently.
The 60-day period in the ordinance was for distribution utilities to publish the guidelines. It is not a general approval deadline for every individual application. Ask for the applicable procedure and the date on which the new schedule will take effect.
Who is eligible and what documents may be required?
Being in the Rural Class is a starting point, not automatic approval. The distribution utility must assess the activity, loads and conditions of the consumer unit. For irrigation, the resolution lists water abstraction and conveyance, fertilizer injection into the line, application of water to the soil and lighting at the locations of that equipment.
Environmental licensing and authorization to use water must be demonstrated when required by law. Where an exemption applies, provide the evidence accepted by the competent authority and the distribution utility. See the guide to the water-use permit for irrigation.
Also check the metering and service entrance requirements for your connection. Neoenergia Elektro, for example, specifies a dedicated connection for the loads listed in its procedure. Do not assume that an existing residential meter will automatically separate eligible consumption.
The free electricity market requires a specific assessment. ANEEL Normative Resolution (REN) No. 1.174/2026 added the rule that this benefit does not apply to a consumer unit classified as free or special in Brazil's electricity market. However, its Article 14 provides a transition for certain units that were already receiving the benefit and had opted to migrate before Decree No. 13.097/2026 took effect. It involves notification, a response from the consumer and different conditions depending on the choice to return to the regulated market or remain in the free market. Do not assume that the benefit is maintained or immediately withdrawn in every case: check the contractual situation and notification with the distribution utility before projecting savings.
After approval, keep the registration and documents up to date and respond to registration review notices. The benefit depends on continuing to meet the criteria.
How to apply for the discount, step by step
- Identify the consumer unit. Gather a recent bill, the consumer unit number, the account holder's details, class, tariff group and electricity procurement arrangement.
- Check the documentation through the official channel. Describe the activity and list the equipment. Check the environmental and water-use documents required for abstraction, including exemption documentation where applicable.
- Prepare a proposed schedule. Determine water requirements, irrigation zone running times and operational availability. The proposal must respect the system's technical conditions and the permitted intervals.
- Submit the application and formalize the arrangement. Apply to the distribution utility for the benefit or a change of operating times. Keep the response and check the registered schedule, metering and start date of the approved classification.
- Only then adjust and check operations. The programmed times must match the formalized schedule. Then compare operating and billing records to check that the benefit is being applied.
Do not alter electrical installations or the service entrance without a design and compliance with the distribution utility's requirements. Scheduling also does not replace the pumping system's protective devices.
How to fit irrigation into the 8h30 window
Compare the pumping hours needed with the available schedule, while preserving the crop's water requirements. Reducing the time without checking flow rate and distribution may simply leave part of the area without adequate replenishment. The guide to the irrigation interval helps organize this assessment.
Hypothetical example: six irrigation zones need to run for two hours each, one at a time, on the same day. Excluding switching operations or maintenance, this amounts to 6 × 2 = 12 hours of pumping. An 8h30 window covers only part of this time, but that portion may still qualify for the benefit if the requirements are met.
The alternatives need to be compared through system design and a cost simulation:
- Keeping part of the operation outside the schedule: may be preferable to investing in a modification whose cost is not justified. Compare consumption within and outside the benefit period alongside other costs.
- Operating two irrigation zones simultaneously: in the example, three pairs running for two hours would total six hours. This works only if each zone maintains its specified flow rate, pressure and water application. The system must supply the combined flow of both zones; pipes, the pump curve, total dynamic head and electrical capacity need to be reassessed. The same volume of water does not mean the same energy consumption. See how to choose the pump for irrigation.
- Assessing water storage: a reservoir can separate water abstraction and application times, but its volume, replenishment, elevations, pressure and any additional pumping must be designed.
- Comparing other sources: a solar pump should be assessed against the generation profile, water requirements and the discount schedule actually contracted. Daytime hours are not necessarily excluded from the benefit under the flexible scheduling rules.
Irrigation automation can help implement the schedule. Check the clock, programming, restart logic after a power failure and equipment protections. Do not assume that every controller will prevent starts outside the schedule or guarantee savings.
FAQ
Can I irrigate at 18h with the discount?
That time falls within the interval normally excluded by MME Ordinance No. 137/2026. An exception depends on ANEEL authorizing the distribution utility under the prescribed conditions; it is not an individual choice by the consumer.
Can I have different schedules for the dry and rainy seasons?
Seasonal schedules may be requested. They must be agreed and formalized with the distribution utility; each period's schedule keeps the same times on every day of the week.
Conclusion
To assess the discount, compare three pieces of information: the classification confirmed by the distribution utility, actual pumping requirements and the cost of alternative operating arrangements. The aim is to use the schedule without compromising irrigation or making an investment based on unsubstantiated savings.
Perin can assess the design and operation of the irrigation system to support this comparison. Provide the municipality, crop, approximate area, water source and pumping characteristics. Approval of the benefit and billing conditions are assessed by the distribution utility.
Contact us on WhatsApp (14) 99824-5219.
contato@perinirrigacao.com.br
Sources consulted
Original research on 24/11/2026, with sources reviewed on 25/11/2026. The consumer unit's conditions and applicable tariff must be confirmed with the distribution utility.
- Brazil. Law No. 10.438/2002, Article 25, consolidated text.
- ANEEL. Normative Resolution No. 1.000/2021, Articles 186 and 205, consolidated version available on the Agency's portal.
- ANEEL. Normative Resolution No. 1.174/2026, amendment to Article 186, transition under Article 14 and effects under Article 18.
- Ministry of Mines and Energy. MME Normative Ordinance No. 137/2026.
- CPFL. New rule for rural irrigation and aquaculture.
- Cemig. Irrigation and Aquaculture Tariffs.
- Cemig. Documentation required to apply for the Rural Tariff Benefit.
- Neoenergia Elektro. Rural Consumers, Irrigators and Aquaculture Producers: requirements, equipment and metering.